Skip to page content
LPS 1.0 vs 2.0 Rules • APCRDA Official Guide

LPS 1.0 (2015) vs LPS 2.0 (2025 Rules) Comparison

Under G.O.Ms.No. 118 (01.07.2025) and G.O.Ms.No. 252 (02.12.2025), the Government of AP codified LPS 2.0, extending proven benefits across 20,494 acres in 7 peripheral villages.

📜 Statutory Authority: G.O.Ms.No. 1 (01-01-2015), G.O.Ms.No. 118 (01-07-2025) & G.O.Ms.No. 252 (02-12-2025)
← Back to APCRDA Knowledge Hub Overview
Statutory Comparison: LPS 1.0 vs LPS 2.0
Key ParameterLPS 1.0 (G.O.Ms.No. 1 / 2015)LPS 2.0 (G.O.Ms.No. 118 & 252 / 2025)
Statutory NotificationG.O.Ms.No. 1, MA&UD (M2) Dept, Dt. 01.01.2015
G.O.Ms.No. 118, MA&UD (CRDA) Dept, Dt. 01.07.2025 & G.O.Ms.No. 252 Dt. 02.12.2025
LPS 2.0 specifically expands land pooling beyond the core 29 villages into the wider Capital Region.
Territorial Scope217.23 sq.km (29 Revenue Villages in Thullur, Mangalagiri & Tadepalli mandals)
7 Peripheral Villages: Vykuntapuram, Pedamadduru, Endrayi, Karlapudi, Vaddamanu, Harichandrapuram, Pedaparimi
LPS 2.0 covers 20,494 acres (16,562.56 acres Patta, 104.01 acres Assigned, 3,828.30 acres Govt land).
Returnable Patta Dry (Per Acre)1,000 Sq. Yards Residential + 250 Sq. Yards Commercial
1,000 Sq. Yards Residential + 250 Sq. Yards Commercial
In G.O.Ms.No. 1 (2015, Rule 5(2)), Dry Commercial was originally notified as 200 Sq. Yds; this was subsequently enhanced to 250 Sq. Yds to ensure full farmer consensus. LPS 2.0 maintains exact parity with the enhanced standard.
Returnable Patta Jareebu (Per Acre)1,000 Sq. Yards Residential + 450 Sq. Yards Commercial
1,000 Sq. Yards Residential + 450 Sq. Yards Commercial
In G.O.Ms.No. 1 (2015, Rule 5(2)), Jareebu Commercial was originally notified as 300 Sq. Yds; subsequent amendments enhanced this to 450 Sq. Yds for Krishna riverbed / canal-irrigated soils. LPS 2.0 preserves identical 450 Sq. Yds parity.
Assigned Lands (Pre-1954 / Ex-Servicemen)1,000 Sq. Yds Res + 250 (Dry) / 450 (Jareebu) Com
1,000 Sq. Yds Res + 250 (Dry) / 450 (Jareebu) Com
Treated on par with Patta landowners.
Assigned Lands (Post-1954 / POT)800 Sq. Yds Res + 100–150 (Dry) / 200 (Jareebu) Com
800 Sq. Yds Res + 100 (Dry) / 200 (Jareebu) Com (Rule 8(4))
Sivaijamadars eligible under Rule 8(5) receive 500 Res + 50/100 Com.
Yearly Crop Loss Annuity₹30,000/acre (Dry) & ₹50,000/acre (Jareebu) for 10 years
₹30,000/acre (Dry) & ₹50,000/acre (Jareebu) for 10 years
Paid annually after harvesting period.
Annual Annuity Increment₹3,000/acre/year (Dry) & ₹5,000/acre/year (Jareebu)
₹3,000/acre/year (Dry) & ₹5,000/acre/year (Jareebu)
10% compounding annual increment to offset cost of living.
Commercial Garden One-Time Bonus₹50,000 per acre (2015 baseline under G.O.Ms.No. 1)
₹1,00,000 per acre (100% statutory hike in 2025 Rules)
Compensates high-value perennial orchards (Lime, Sapota, Guava, Amla, Jasmine).
Landless Agricultural Laborer Pension₹2,500/month flat for 10 years per family
₹2,500/month + annual inflation indexing linked to CPI-AL
Protects landless farmhands against real cost-of-living increases across 10 years.
Unauthorized Private Layout ProtectionSubject to individual compounding penalties and uncertain regularization
Rule 14 guarantees nearest standard plot up to 65% of plotted area (max 500 Sq. Yds)
Rescues pre-notification registered buyers in unapproved layouts with bankable title.
RFCTLARR Act Award Equivalency & Stamp DutyEquated to award in lieu of compensation under Sections 107/108 of RFCTLARR Act 2013
Section 96 RFCTLARR Act full exemption + one-time family transfer stamp duty waiver
Zero registration fee on LPOC allotment, plus free transfer to spouse or children.
Stamp Duty & Registration Exemption100% exempt on LPOC issuance & initial development agreement
100% exempt on surrender, LPOC allotment, and first development agreement
Section 51 of APCRDA Act guarantees complete registration fee waiver.
Capital Gains Tax ExemptionExempt under Section 10(37A) of Income Tax Act 1961
Exempt under Section 10(37A) of Income Tax Act 1961
Transfer of reconstituted plot by original pooling farmer is zero capital gains tax.
Demarcation of Gramakantam (Village Core)Demarcated and 100% exempted from pooling
Demarcated through FMB/Village Survey and 100% exempted
Existing settlements are protected and provided upgraded urban connectivity.
📜

The Statutory Gazette Pipeline: From Intention to Absolute Vesting

Under Sections 55, 56, and 57 of the APCRDA Act, 2014 and Rule 19 of the 2025 Rules, land pooling is enacted through a rigorous, legally binding 4-stage pipeline published in the Extra-ordinary issues of the Andhra Pradesh Gazette.

Stage 1Mandatory 30-day window
Section 55(4) / Rule 19(1)

Notification-I: Declaration of Intention (Draft)

Initiated by the Commissioner or Competent Authority earmarking the specific area proposed for pooling. Opens a mandatory 30-day window for landowners to submit objections (Form-9.2 or Telugu equivalent) or surrender consent (Form-I).

⚖️ Mandatory oral hearings and enquiries conducted before any boundary freeze.
Stage 2Post-Hearing Finalization
Section 55(6) / Rule 19(3)

Notification-IA: Modification & Finalization of Scheme Area

If public hearings and oral enquiries reveal valid planning or administrative concerns, the originally notified boundaries are formally modified and published as a finalized boundaries notice.

⚖️ Fixes the immutable geographical perimeter of the revenue pooling unit.
Stage 330-day layout objection window
Section 56(1) / Rule 19(4)

Notification-II: Draft Land Pooling Scheme (LPS)

The Authority publishes the draft scheme detailing the proposed layout of reconstituted plots, earmarked public infrastructure, and land reservation percentages (roads, parks, utilities) in accordance with Section 44 and Section 53.

⚖️ Landowners inspect individual plot allocations and propose layout adjustments.
Stage 4Within 180 days of intention
Section 57(1) & (2) / Rule 19(5)

Notification-III: Final Land Pooling Scheme (Absolute Vesting)

Published within 180 days of the initial declaration of intent. Upon its publication, all pooled lands vest absolutely in the Authority free from all encumbrances.

⚖️ All original agricultural titles vest in APCRDA; irreversible legal transition to reconstituted plot rights.
📋

Meticulous Form Ecosystems: 2015 Capital City vs 2025 Capital Region Rules

The 2015 Rules designated forms prefixed with "9" (referencing Chapter IX of the APCRDA Act), whereas the 2025 Rules consolidated these into streamlined Roman alphanumeric instruments (Form I to Form VI).

Phase / Legal Action2015 Rules (Form #)2025 Rules (Form #)Instrument Purpose & Public Law Significance
Initial ConsentForm 9.3Form IConsent Form (Application with Affidavit): Landowner voluntarily relinquishes alienable rights to participate in the LPS.
Official ReceiptForm 9.7Form IIAcknowledgement Receipt: Officially logs the submission of title deeds, pattadar passbooks, and 15-year Encumbrance Certificates (EC).
Formal SurrenderForm 9.23Form IIISurrender of Rights & Possession: Legally transfers physical possession and right of title over the scheduled property to the Authority.
Plot EntitlementForm 9.12Form IVAcknowledgement of Entitlement: Acknowledges the specific square yardage of residential and commercial plots the farmer is legally entitled to receive.
Development ContractForm 9.14Form VStatutory Contract of Development (GPA): Binds the Authority to infrastructure development deadlines and delivery timelines under public law.
Final OwnershipForm 9.24Form VILand Pooling Ownership Certificate (LPOC): Conclusive, legally marketable proof of title of the reconstituted plots, free from all encumbrances.
📁

Schedule V: Master Directory of All 32 Prescribed Statutory Forms

అధికారిక షెడ్యూల్ 5: మొత్తం 32 చట్టబద్ధమైన ఫారమ్‌ల సంపూర్ణ గైడ్ (ఫారం 9.1 నుండి 9.32 వరకు)

Under G.O.Ms.No. 1 (dated 01.01.2015), the Government of Andhra Pradesh codified 32 distinct statutory forms under Chapter IX of Act No. 11 of 2014, covering every phase from declaration of intent to civil court summons and final layout completion certificates.

Form & RuleStageTitle & Prescribed SubjectStatutory Purpose & Legal Significance
Form 9.1
Rule 6(2)
Section 43(5)
Declaration & Consent
ప్రకటన & సమ్మతి
Notice of Declaration of Intention to Undertake Land Pooling Scheme
ల్యాండ్ పూలింగ్ స్కీమ్ ప్రారంభ ఉద్దేశ ప్రకటన నోటీసు
Officially announces intent to formulate LPS, identifies proposed boundaries, schedules stakeholder village consultations, and invites objections/applications.
⚖️ Statutory Effect: Mandatorily published across 2 daily newspapers (at least 1 Telugu), beat of drum / tom-tom in the village, local notice boards, and the official website.
Form 9.2
Rule 6(2)(i)
Section 44
Declaration & Consent
ప్రకటన & సమ్మతి
Form for Filing Objections & Suggestions on Area of LPS
ల్యాండ్ పూలింగ్ విస్తీర్ణం మరియు సరిహద్దులపై అభ్యంతరాల దాఖలు పత్రం
Standardized petition for landowners to file objections or suggestions regarding boundary inclusions, exclusions, and settlement protection within 30 days.
⚖️ Statutory Effect: Forms the statutory foundation for village-level "9.2 Exemption Proceedings" used to preserve and exempt Gramakantam/habitation sites from pooling.
Form 9.3
Rule 6(2)(ii)
Section 44 & 48
Declaration & Consent
ప్రకటన & సమ్మతి
Application Form with Affidavit for Voluntary Surrender & Participation in LPS
ల్యాండ్ పూలింగ్‌లో స్వచ్ఛంద భాగస్వామ్యం కోసం దరఖాస్తు మరియు అఫిడవిట్
Primary consent instrument where landowner agrees to surrender land in exchange for guaranteed reconstituted plots, backed by a 13-point sworn affidavit and 20-clause undertaking.
⚖️ Statutory Effect: Binds the landowner to title warranties, non-encumbrance indemnities, and voluntary surrender of physical possession under public law.
Form 9.4
Rule 7(1)
Section 44
Declaration & Consent
ప్రకటన & సమ్మతి
List of Disposals on Objections and Suggestions
స్వీకరించిన అభ్యంతరాలు మరియు సూచనల పరిష్కార అధికారిక జాబితా
Detailed schedule logging each Form 9.2 objection received, the Competent Authority’s inquiry findings, and the formal reasons for acceptance or rejection.
⚖️ Statutory Effect: Disposals must be finalized within 15 days of the last date of objections and submitted to the Government for formal area confirmation.
Form 9.5
Rule 7(2)
Section 44
Declaration & Consent
ప్రకటన & సమ్మతి
Notification of Finalized Area for Preparation of Land Pooling Scheme
ల్యాండ్ పూలింగ్ స్కీమ్ తయారీకి ఖరారైన తుది విస్తీర్ణ నోటిఫికేషన్
Formal public gazette declaring the exact boundary survey numbers and acreage approved by the Government to proceed for LPS detailed planning.
⚖️ Statutory Effect: Freezes land boundaries for detailed Electronic Total Station (ETS) base mapping and initiates mandatory individual title verification notices.
Form 9.6
Rule 8(1)
Section 133
Verification & Title
ధ్రువీకరణ & టైటిల్
Individual Notice to Landowners to Participate in LPS & Produce Title Records
రైతులకు వ్యక్తిగత నోటీసు: రికార్డుల సమర్పణ మరియు పూలింగ్ భాగస్వామ్య ఆహ్వానం
Statutory individual notice served upon every recorded pattadar and occupier instructing them to submit original ownership records within specified dates.
⚖️ Statutory Effect: Served in accordance with Section 133 of the Act; failure to produce records may result in issuance of judicial summons under Rule 15.
Form 9.7
Rule 8(2)
Section 48(1)
Verification & Title
ధ్రువీకరణ & టైటిల్
Official Receipt of Application with Land Title Documents
టైటిల్ పత్రాలు మరియు దరఖాస్తు స్వీకరణకు అధికారిక రశీదు
Formal acknowledgment issued to the landowner receipting original sale deeds, link documents, pattadar passbooks, and 15-year ECs.
⚖️ Statutory Effect: Mandatory statutory proof establishing that original documents are held in secure government custody for verification.
Form 9.8
Rule 8(3)
Section 48(1)
Verification & Title
ధ్రువీకరణ & టైటిల్
Publication of List of Claims of Landowners Inviting Objections
రైతుల టైటిల్ క్లెయిముల జాబితా ప్రచురణ మరియు అభ్యంతరాల ఆహ్వానం
Public notice listing all claimed land ownerships, survey numbers, and extents, inviting third-party objections within 15 days of publication.
⚖️ Statutory Effect: Guarantees transparent public scrutiny before state recognition of ownership; protects family co-heirs and creditors.
Form 9.9
Rule 8(4)
Section 48
Verification & Title
ధ్రువీకరణ & టైటిల్
Requisition to District Collector Requesting Verification of Specific Land Categories
ప్రభుత్వ, దేవాదాయ, వక్ఫ్ & అసైన్డ్ భూముల ధ్రువీకరణకు కలెక్టర్‌కు విజ్ఞప్తి పత్రం
Official requisition sent to District Collector to conduct joint revenue verification on disputed lands, Inam lands, Wakf/Endowment properties, and Assigned lands.
⚖️ Statutory Effect: Resolves disputed government vs. private rights before finalizing eligible reconstituted plot sizes.
Form 9.10
Rule 8(5)
Section 48(2)
Verification & Title
ధ్రువీకరణ & టైటిల్
Orders Confirming Eligibility to Participate in Land Pooling Scheme
ల్యాండ్ పూలింగ్‌లో పాల్గొనేందుకు రైతు అర్హతను ధ్రువీకరించే ఉత్తర్వు
Judicial/revenue order issued under the revenue seal and signature of the Competent Authority confirming a landowner’s clean title and eligibility.
⚖️ Statutory Effect: Legally clears the path to determine returnable plot extents and execute the binding Development Agreement.
Form 9.11
Rule 8(6)
Section 48(3)
Verification & Title
ధ్రువీకరణ & టైటిల్
List of Landowners and Lands Who Have Not Given Consent under LPS
ల్యాండ్ పూలింగ్ స్కీమ్‌కు సమ్మతి తెలియజేయని భూములు మరియు రైతుల జాబితా
Public schedule enumerating non-consenting survey parcels, owners, and acreage published at the Competent Authority office and website.
⚖️ Statutory Effect: These parcels are formally marked for alternative planning solutions or compulsory land acquisition proceedings under Chapter IX / Central Act 30 of 2013.
Form 9.12
Rule 8(7)
Section 49
Verification & Title
ధ్రువీకరణ & టైటిల్
Determination of Eligible Extent of the Reconstituted Plot for Landowner
రైతుకు లభించే రిటర్నబుల్ ప్లాట్ ఖచ్చితమైన విస్తీర్ణ నిర్ధారణ ఉత్తర్వు
Statutory order computing the exact square yards of residential and commercial returnable plots due to the owner based on pooled acreage and dry/jareebu classification.
⚖️ Statutory Effect: Guarantees the exact entitlement figure incorporated into Schedule-B of the registered Form 9.14 Development Agreement.
Form 9.13
Rule 8(8)
Section 49
Verification & Title
ధ్రువీకరణ & టైటిల్
Consolidated List of Landowners Eligible to Participate in LPS
ల్యాండ్ పూలింగ్‌కు అర్హత సాధించిన రైతుల సమీకృత తుది జాబితా
Master administrative ledger compiled by the Competent Authority and submitted to the Commissioner, APCRDA confirming all verified participants.
⚖️ Statutory Effect: Authorizes the Competent Authority to enter into Form 9.14 Development Agreements across the entire village unit.
Form 9.14
Rule 8(8)
Section 49 & 50
Verification & Title
ధ్రువీకరణ & టైటిల్
Development Agreement cum Irrevocable General Power of Attorney
చట్టబద్ధమైన అభివృద్ధి ఒప్పందం మరియు జనరల్ పవర్ ఆఫ్ అటార్నీ (GPA)
Bilateral statutory contract registered between APCRDA and landowner. Transfers boundary alteration and development powers to the Authority while guaranteeing return of reconstituted plots.
⚖️ Statutory Effect: Classified as a Statutory Contract under public law; enforceable via High Court Writ Petitions under Article 226; 100% exempt from stamp duty and registration fees.
Form 9.15
Rule 9(2)(e)
Section 51
Survey & Demarcation
సర్వే & హద్దులు
Electronic Total Station (ETS) Survey Notice to Revenue Department
ఎలక్ట్రానిక్ టోటల్ స్టేషన్ (ETS) సర్వే నోటీసు: రెవెన్యూ శాఖకు సమాచారం
Formal requisition notifying the Tahsildar and Mandal Surveyor to depute revenue representatives for field boundary identification during ETS survey.
⚖️ Statutory Effect: Ensures inter-departmental harmony between Land Records Department adangals/FMB and APCRDA digital cartography.
Form 9.16
Rule 9(2)(e)
Section 51
Survey & Demarcation
సర్వే & హద్దులు
ETS Survey Notice to Landowner (Mandatory 24-Hour Advance Written Notice)
ETS డిజిటల్ సర్వే నోటీసు: రైతుకు 24 గంటల ముందస్తు లిఖితపూర్వక సమాచారం
Mandatory advance written notice served on the landowner at least 24 hours prior to entering the parcel for digital Total Station boundary mapping.
⚖️ Statutory Effect: Affords the landowner a statutory right to be personally present and verify boundary pegs on the ground before base map finalization.
Form 9.17
Rule 9(3)
Section 51
Survey & Demarcation
సర్వే & హద్దులు
Certification of Area Statement, Final Base Map & List of Landowners
విస్తీర్ణ ప్రకటన, తుది బేస్ మ్యాప్ మరియు రైతుల వివరాల అధికారిక సర్టిఫికేషన్
Joint certification signed by the Competent Authority and Revenue Officers authenticating the superimposed ETS base map against village revenue registers.
⚖️ Statutory Effect: Locks the spatial baseline from which sector layouts and reconstituted plot boundaries are mathematically generated.
Form 9.18
Rule 9(6)(h)
Section 53
Survey & Demarcation
సర్వే & హద్దులు
Application for Joint Allotment of Final Reconstituted Plots
ఉమ్మడి రిటర్నబుల్ ప్లాట్ల కేటాయింపు కోసం రైతుల దరఖాస్తు పత్రం
Application submitted by co-owners, family members, or fractional landowners to pool their entitlement yardage into a single larger commercial/residential plot.
⚖️ Statutory Effect: Eliminates fractional plot unviability and enables optimal commercial development of prominent corner and boulevard sites.
Form 9.19
Rule 9(7)
Section 56 r/w Sec 44
Survey & Demarcation
సర్వే & హద్దులు
Statement of Stakeholder Consultations Made u/s 56 read with Section 44
సెక్షన్ 56 మరియు 44 ప్రకారం ప్రజలతో నిర్వహించిన సంప్రదింపుల రికార్డు
Official minutes detailing public consultations conducted with landowners regarding draft LPS provisions, amenities, and layout design.
⚖️ Statutory Effect: Demonstrates participatory urban planning compliance before submittal of Draft LPS to the Authority for statutory approval.
Form 9.20
Rule 10(1)
Section 56
Draft & Final Scheme
ముసాయిదా & తుది స్కీమ్
Notification of Draft Land Pooling Scheme Calling for Objections / Suggestions
ముసాయిదా ల్యాండ్ పూలింగ్ స్కీమ్ నోటిఫికేషన్: అభ్యంతరాలు / సూచనల ఆహ్వానం
Public notification publishing the Draft LPS layout map, services plans (water, sewer, power), and sector allocations, inviting objections within 30 days.
⚖️ Statutory Effect: Allows citizens and developers to examine the geometric feasibility, road widths, and zoning compatibility of the proposed layout.
Form 9.21
Rule 10(2)
Section 56
Draft & Final Scheme
ముసాయిదా & తుది స్కీమ్
Form of Filing Objections / Suggestions on Draft LPS
ముసాయిదా ల్యాండ్ పూలింగ్ స్కీమ్‌పై అభ్యంతరాల సమర్పణ ఫారమ్
Prescribed legal format for lodging specific technical objections regarding road alignments, open spaces, or plot reconstitution proposals.
⚖️ Statutory Effect: The Competent Authority is statutorily mandated to evaluate all submissions and report recommended layout revisions within 30 days.
Form 9.22
Rule 10(4)
Section 57
Draft & Final Scheme
ముసాయిదా & తుది స్కీమ్
Notice of Final Land Pooling Scheme (Gazette Publication)
తుది ల్యాండ్ పూలింగ్ స్కీమ్ ఆమోద నోటీసు (అధికారిక గెజిట్ ప్రచురణ)
Official notice declaring formal sanction and approval of the Final LPS layout by the Authority, published in the Extraordinary District Gazette.
⚖️ Statutory Effect: Acts as deemed layout approval for 3 years (Rule 12(2)) and triggers mandatory physical possession takeover (Form 9.23).
Form 9.23
Rule 10(4)
Section 57(1)
Vesting & LPOC
నిక్షిప్తం & LPOC
Taking Possession of Land from Landowners
రైతుల నుండి భూమి యొక్క అధికారిక భౌతిక స్వాధీన పత్రం
Instrument executed when the Competent Authority takes formal physical possession of pooled agricultural lands from the registered owners.
⚖️ Statutory Effect: Under Section 57(1) of the Act, all lands vest absolutely in the Authority free from all encumbrances upon execution of this form.
Form 9.24
Rule 11(4)
Section 51 & 57
Vesting & LPOC
నిక్షిప్తం & LPOC
Land Pooling Ownership Certificate (LPOC)
ల్యాండ్ పూలింగ్ యాజమాన్య ధ్రువీకరణ పత్రం (LPOC)
The crown statutory title deed issued under the seal and signature of the Commissioner, APCRDA granting absolute, alienable, freehold title to the reconstituted plot.
⚖️ Statutory Effect: Conclusive proof of holder’s title under Section 51(3); entry into registration records without stamp duty or registration fees; 100% bank mortgageable.
Form 9.25
Rule 11(6)
Section 57
Vesting & LPOC
నిక్షిప్తం & LPOC
Details of LPOCs and Land Contributed by Landowners for Availability on Website
జారీ చేసిన LPOCలు మరియు రైతులు ఇచ్చిన భూముల వివరాల వెబ్‌సైట్ పబ్లికేషన్
Public registry published on the official APCRDA website listing original survey numbers, pooled acreage, allotted sector/plot codes, and LPOC serial numbers.
⚖️ Statutory Effect: Establishes public electronic provenance preventing duplicate plot sales or fraudulent title impersonation.
Form 9.26
Rule 12(1)(a)
Section 57(6)
Possession & Implementation
స్వాధీనం & అమలు
Register of Reserved Lands Category-Wise (Parks, Roads, Utilities, EWS)
రిజర్వ్ చేసిన స్థలాల వర్గీకరణ రిజిస్టర్ (పార్కులు, రోడ్లు, సామాజిక వసతులు, EWS)
Statutory municipal asset register recording lands earmarked for parks (10%), roads (30%), social facilities (5%), and affordable housing (5%).
⚖️ Statutory Effect: Vests civic amenity lands in perpetuity; strictly prohibits unauthorized commercial encroachment or change of land use.
Form 9.27
Rule 12(1)(b)
Section 57(7)
Possession & Implementation
స్వాధీనం & అమలు
Register of Lands Taken Over by the Authority / Landowner
అథారిటీ మరియు రైతులు పరస్పరం స్వాధీనం చేసుకున్న స్థలాల రిజిస్టర్
Comprehensive master ledger tracking all reconstituted land parcels handed over to the Authority or returned to private owners across development sectors.
⚖️ Statutory Effect: Authoritative audit record maintaining reconciliation between total surrendered acreage and total reconstituted square yardage.
Form 9.28
Rule 12(4)
Section 57
Possession & Implementation
స్వాధీనం & అమలు
Handing Over of Physical Possession of Reconstituted Plots
అభివృద్ధి చేసిన ప్లాట్ల భౌతిక స్వాధీన అప్పగింత అధికారిక సర్టిఫికేట్
Execution certificate signed upon physically walking the plot on ground, verifying corner boundary stones, and handing over possession within 12 months of Final LPS.
⚖️ Statutory Effect: Mandatory milestone; confirms that the allottee has taken unimpeded physical occupancy of the surveyed and demarcated site.
Form 9.29
Rule 13(1)
Section 59(1)
Completion & Mutations
పూర్తి & మ్యుటేషన్లు
Publication of Notice of Completion of Final Land Pooling Scheme
తుది ల్యాండ్ పూలింగ్ స్కీమ్ సంపూర్ణ నిర్మాణ పూర్తి ప్రకటన నోటీసు
Statutory notice published by the Commissioner certifying that all roads, utility ducts, water mains, sewers, and power infrastructure are 100% completed.
⚖️ Statutory Effect: Published under Section 59(1) of the Act; triggers handover of common maintenance and municipal services.
Form 9.30
Rule 13(2)
Section 59(2)
Completion & Mutations
పూర్తి & మ్యుటేషన్లు
Publication of Reconstituted Plots After Carrying Out Mutations in Land Records
రెవెన్యూ రికార్డుల్లో మ్యుటేషన్ పూర్తి చేసి తుది ప్లాట్ల వివరాల ప్రచురణ
Official publication verifying that agricultural survey numbers have been dissolved and mutated into formal urban plot codes within the Revenue Department Record of Rights (RoR).
⚖️ Statutory Effect: Executed within 30 days of mutations; legally seals the title conversion from agricultural land to urban municipal real estate.
Form 9.31
Rule 13(3)
Section 59(3)
Completion & Mutations
పూర్తి & మ్యుటేషన్లు
Completion Certificate of Final Land Pooling Scheme Layout
ల్యాండ్ పూలింగ్ స్కీమ్ లేఅవుట్ సమగ్ర పూర్తి సర్టిఫికేట్ (Completion Certificate)
The ultimate statutory completion certificate confirming that the layout strictly satisfies all Master Plan planning norms, environmental clearances, and engineering standards.
⚖️ Statutory Effect: Final close-out document of the LPS scheme under Section 59(3); certifies that the area is fully fit for high-density building construction.
Form 9.32
Rule 15(2)(i)
Section 133 & CPC
Judicial Summons
న్యాయ సమన్లు
Summons to Appear in Person and to Produce Original Documents
విచారణకు స్వయంగా హాజరై అసలు పత్రాలను సమర్పించాలని జారీ చేసే సమన్లు
Judicial process issued by the Competent Authority exercising Civil Court powers to compel personal attendance and production of 6 mandatory title documents.
⚖️ Statutory Effect: Enforceable under the Code of Civil Procedure, 1908 (CPC); non-compliance constitutes a legal offence punishable under law.
Showing 32 of 32 prescribed statutory forms (Schedule V, G.O.Ms.No. 1 / 2015)Prefix "9" corresponds to Chapter IX (Land Pooling Scheme) of APCRDA Act No. 11 of 2014
🗺️

Schedule IV: Mandatory Spatial Land Reservations (Section 53(1)(e) & (f))

షెడ్యూల్ 4: ల్యాండ్ పూలింగ్ విస్తీర్ణంలో చట్టబద్ధమైన స్థల కేటాయింపు నిష్పత్తులు

Under Section 53 of the APCRDA Act and Schedule IV of the 2015 Rules, every assembled land pooling sector must strictly dedicate mandatory spatial shares for environmental open spaces, roads, social infrastructure, and affordable housing before private allotments are demarcated.

Section 53(1)(e) & Schedule IV10%

Parks, Playgrounds, Gardens & Open Spaces

పార్కులు, ఆట స్థలాలు, ఉద్యానవనాలు & బహిరంగ ప్రదేశాలు

Mandatory environmental green lung and civic recreational spaces distributed hierarchically across sectors.

Section 53(1)(e) & Schedule IV30%

Roads and Utility Services

రహదారులు మరియు యుటిలిటీ కారిడార్లు

Arterial, sub-arterial, and sector roads, underground utility ducts, water mains, power corridors, and stormwater networks.

Section 53(1)(e) & Schedule IV5%

Social Infrastructure (Schools, Healthcare & Community Facilities)

సామాజిక మౌలిక వసతులు (పాఠశాలలు, ఆసుపత్రులు & సమాజ భవనాలు)

Sites reserved for primary/secondary schools, primary health centres, community halls, sub-stations, and civic nodes.

Section 53(1)(f) & Schedule IV5%

Affordable Housing for the Poor (EWS)

పేదల కోసం సరసమైన గృహ నిర్మాణం (EWS Housing)

Dedicated land bank for Economically Weaker Section (EWS) residential dwelling units and rehabilitation housing.

Rule 5(2) & Schedule II~25% – 30%

Landowners Reconstituted Returnable Plots

రైతులకు తిరిగి కేటాయించే అభివృద్ధి చేసిన ప్లాట్లు

Fully developed residential and commercial reconstituted plots returned to participating farmers near their pooled land.

Section 53 & Schedule IVBalance Land (~20% – 25%)

APCRDA Authority Share (Capital Financing & Institutions)

APCRDA అథారిటీ వాటా (రాజధాని నిర్మాణం & మౌలిక నిధులు)

Balance land retained by the Authority for government buildings, trunk infrastructure, theme cities, and capital monetization.

🌾

Schedule III & Rule 5(3): Comprehensive Farmer Protection & Social Safety Net

షెడ్యూల్ 3: రైతులకు మరియు స్థానిక ప్రజలకు ప్రభుత్వ చట్టబద్ధమైన హామీలు & సామాజిక భరోసా

The 2015 Rules established an unprecedented social contract guaranteeing 12 statutory protections to ensure that agricultural laborers, smallholders, and village residents were made true partners in capital city growth.

Rule 5(3), G.O.Ms.No. 1PENSION

Social Security Fund Pension (₹2,500/Month for 10 Years)

సామాజిక భద్రతా పింఛన్ (నెలకు ₹2,500 చొప్పున 10 ఏళ్ళు)
👥 Beneficiaries: All Landless Agricultural Laborer Families

A statutory monthly pension of ₹2,500 disbursed to every landless family in the capital city area for 10 years through the dedicated Capital Region Social Security Fund.

Schedule III, Clause 1(ii)(a)LOANS

Agricultural Crop Loan Waiver (Up to ₹1.50 Lakhs)

రైతుల వ్యవసాయ రుణమాఫీ (కుటుంబానికి ₹1.50 లక్షల వరకు)
👥 Beneficiaries: Participating Farmers in LPS Area

One-time agricultural debt waiver of up to ₹1,50,000 per farmer family to clear agricultural loans held with banks and primary credit societies.

Schedule III, Clause 1(ii)(e)LOANS

Interest-Free Self-Employment Loans (Up to ₹25 Lakhs)

వడ్డీ లేని స్వయం ఉపాధి రుణాలు (₹25 లక్షల వరకు)
👥 Beneficiaries: Poor Resident Families in LPS Area

Subsidized zero-interest loans of up to ₹25 Lakhs provided to economically disadvantaged families to establish micro-enterprises and vocational self-employment.

Schedule III, Clause 1(iii)(d)SOCIAL WELFARE

NREGA Guaranteed Work Enhanced to 365 Days/Year

ఉపాధి హామీ పని దినాలు ఏడాదికి 365 రోజులకు పెంపు
👥 Beneficiaries: Agricultural Laborers & Rural Households

Statutory enhancement of Mahatma Gandhi National Rural Employment Guarantee Scheme (MGNREGS) from standard 100 days to a full 365 days of guaranteed paid work per family per year.

Schedule III, Clause 1(iii)(a)SOCIAL WELFARE

Free Education and Super-Specialty Medical Facilities

ఉచిత నాణ్యమైన విద్య మరియు కార్పొరేట్ వైద్య సదుపాయాలు
👥 Beneficiaries: All Persons Residing as on 8th December, 2014

Perpetual free school/college education and comprehensive healthcare coverage to all bona fide residents registered as of the statutory cut-off date (08-12-2014).

Schedule III, Clause 1(iii)(g)RIGHTS

Private Teak Trees Harvest & Transit Rights (100% Fee Exemption)

టేకు చెట్ల నరికివేత & రవాణా హక్కులు (అటవీ శాఖ ఫీజుల మినహాయింపు)
👥 Beneficiaries: Landowners with Timber & Teak Plantations

Exclusive authorization for landowners to fell, transport, and commercially sell valuable teak trees on their private lands with expedited Forest Department transit permits and zero government royalties/fees.

Schedule III, Clause 1(iii)(f)SOCIAL WELFARE

Priority Engagement of Local Tractors in Capital Works

రాజధాని నిర్మాణ పనుల్లో స్థానిక రైతుల ట్రాక్టర్ల వినియోగం
👥 Beneficiaries: Local Tractor Owners & Operators

Mandatory statutory clause directing engineering contractors to engage tractors owned by local residents for earthmoving, transport, and capital infrastructure works.

Schedule III, Clause 1(ii)(b,c)RIGHTS

Gramakantam Habitations Demarcation & Freehold Title Regularization

గ్రామకంఠం ఆవాసాల గుర్తింపు & ఉచిత యాజమాన్య ధ్రువీకరణ
👥 Beneficiaries: Village Site (Habitation) Residents

Explicit demarcation of village habitations (R1 Village Planning Zones) and issuance of statutory possession certificates to regularize house sites free of cost without land pooling surrender.

Rule 5(5) & Schedule III, Clause 1(iii)(i)RIGHTS

Right to Harvest Standing Crops & Structure Compensation

చేతికొచ్చిన పంట కోత హక్కు & గ్రామకంఠం వెలుపలి నిర్మాణాలకు నష్టపరిహారం
👥 Beneficiaries: Farmers with Standing Annual & Perennial Crops

Full legal right to harvest all standing annual crops without obstruction, alongside independent statutory compensation for agricultural structures, borewells, and sheds outside Gramakantam.

Schedule III, Clause 1(iii)(h)MEMORIAL

Statutory Memorial: Administrative Building Named After M.S.S. Koteswara Rao

స్మారక గౌరవం: ఎం.ఎస్.ఎస్. కోటేశ్వరరావు గారి పేరిట ప్రభుత్వ భవనం
👥 Beneficiaries: Capital Region Public Memory & Heritage

Binding commitment by the Government of Andhra Pradesh to name a major administrative complex/building in the capital city after the prominent leader M.S.S. Koteswara Rao.

Schedule III, Clause 1(iii)(b,c)SOCIAL WELFARE

Establishment of Old Age Homes & NTR Canteens

వృద్ధాశ్రమాలు & ఎన్టీఆర్ క్యాంటీన్ల శాశ్వత ఏర్పాటు
👥 Beneficiaries: Senior Citizens & Economically Weaker Residents

Civic infrastructure commitment to establish state-funded senior citizen welfare homes and subsidized nutritional NTR canteens across the capital city.

Schedule III, Clause 1(iii)(e)SOCIAL WELFARE

Skill Development Institute with Monthly Training Stipends

నైపుణ్యాభివృద్ధి శిక్షణ సంస్థ & నెలకు స్టైపెండ్ చెల్లింపు
👥 Beneficiaries: Cultivating Tenants, Agricultural Youths & Workers

Dedicated vocational institute providing certified polytechnic, technical, and service-sector training with monthly living stipends to facilitate career transition into modern urban jobs.

⏱️

Rigid Statutory Implementation Milestones & Time Limits

చట్టబద్ధమైన కాలపరిమితులు మరియు అమలు గడువులు (రూల్స్ 6, 8, 9, 10, 12 & 13)

The 2015 statutory rules impose strict chronological windows on both the Authority and landholders, ensuring time-bound execution from initial consent to final Record of Rights (RoR) mutation.

Rule CitationMilestone & ActionStatutory Time LimitLegal Consequence & Enforcement Authority
Rule 6(2)(i)
Filing Objections & Suggestions on LPS Area (Form 9.2)
ల్యాండ్ పూలింగ్ విస్తీర్ణంపై అభ్యంతరాల దాఖలు (ఫారం 9.2)
Within 30 Days
Landowners and stakeholders raise claims regarding Gramakantam, boundaries, and exclusions.
Enforced by: Competent Authority for Land Pooling (Deputy Collector)
Rule 6(2)(iii)
Conduct of Stakeholder Village Consultations
గ్రామాల్లో రైతులతో ముఖాముఖి సంప్రదింపుల నిర్వహణ
Not earlier than 7 Days
Guarantees adequate notice before conducting mandatory stakeholder awareness meetings.
Enforced by: Competent Authority & Revenue Team
Rule 8(3)
Verification of Title & Publication of Claims (Form 8.8)
టైటిల్ పత్రాల ధ్రువీకరణ & క్లెయిముల జాబితా ప్రచురణ (ఫారం 9.8)
Within 7 Days / 15 Days Objections
Ownership verified against revenue records; objections invited for 15 days.
Enforced by: Competent Authority & Sub-Registrar / Tahsildar
Rule 9(2)(e)
Advance Notice for Electronic Total Station (ETS) Survey (Form 9.16)
ETS డిజిటల్ సర్వేకు రైతుకు ముందస్తు లిఖితపూర్వక నోటీసు (ఫారం 9.16)
Mandatory 24 Hours in Advance
Landowner must be informed in writing to be personally present during field boundary measurement.
Enforced by: Survey & Land Records Team / APCRDA Engineers
Rule 10(1)
Objections on Draft Land Pooling Scheme (Form 9.21)
ముసాయిదా ల్యాండ్ పూలింగ్ స్కీమ్‌పై అభ్యంతరాలు (ఫారం 9.21)
Within 30 Days
Statutory window to challenge sector planning, reconstitution layout, and plot geometry.
Enforced by: Competent Authority & Commissioner APCRDA
Rule 10(4)
Gazette Publication of Final LPS (Form 9.22)
తుది ల్యాండ్ పూలింగ్ స్కీమ్ గెజిట్ నోటిఫికేషన్ (ఫారం 9.22)
Within 15 Days of Approval
Published in District Gazette; triggers legal possession transfer (Form 9.23) and absolute vesting.
Enforced by: District Collector & APCRDA
Rule 12(2)
Statutory Validity of Deemed Layout Permission
డీమ్డ్ లేఅవుట్ డెవలప్‌మెంట్ అనుమతి చట్టబద్ధమైన చెల్లుబాటు
Valid for 3 Years
Final LPS operates as deemed statutory layout approval, obviating independent municipal sanctions.
Enforced by: APCRDA Executive Committee
Rule 12(3)
Ground Peg-Marking with Boundary Stones
క్షేత్రస్థాయిలో సరిహద్దు రాళ్ళతో పెగ్-మార్కింగ్ పూర్తి చేయడం
Within 60 Days
Mandatory physical demarcation of sector layouts and reconstituted plot blocks on the ground.
Enforced by: APCRDA Engineering Wing
Schedule II(1)(e)
Issuance of Alienable LPOC (Form 9.24)
సర్వహక్కులతో కూడిన LPOC యాజమాన్య పత్రాల జారీ (ఫారం 9.24)
Within 9 Months
Creates conclusive proof of title, legally transferable and bankable without stamp duty.
Enforced by: Commissioner, APCRDA
Rule 12(4) & Schedule II(1)(f)
Handover of Physical Possession of Reconstituted Plots (Form 9.28)
అభివృద్ధి చేసిన ప్లాట్ల భౌతిక స్వాధీనం అప్పగింత (ఫారం 9.28)
Within 12 Months
Farmer receives physical possession certificate (Form 9.28) with motorable road access.
Enforced by: Competent Authority for Land Pooling
Rule 13(1) & Schedule II(1)(g)
Completion of Scheme Infrastructure & Services (Form 9.31)
సంపూర్ణ మౌలిక వసతుల నిర్మాణం & కంప్లీషన్ సర్టిఫికేట్ (ఫారం 9.31)
Within 3 Years
All roads, drainage, water supply, power cables, and open spaces must be fully completed.
Enforced by: APCRDA Engineering & Urban Services Wings
Rule 13(2)
Mutation in Revenue Records & Publication (Form 9.30)
రెవెన్యూ రికార్డుల్లో మ్యుటేషన్ పూర్తి చేసి జాబితా ప్రచురణ (ఫారం 9.30)
Within 30 Days
Publicly seals the Record of Rights (RoR) mutation reflecting newly reconstituted plots.
Enforced by: Tahsildar & Competent Authority

Rule 15: Civil Court Powers & Form 9.32 Checklist

Under Rule 15, the Competent Authority possesses the judicial powers of a Civil Court under the Code of Civil Procedure, 1908 (CPC) to issue summons (Form 9.32) and compel production of 6 mandatory documents:

  • Original Land Sale Deeds & Registered Link Documents (30+ Years): అసలు సేల్ డీడ్లు మరియు 30 సంవత్సరాల రిజిస్టర్డ్ లింక్ డాక్యుమెంట్లు
  • Pattadar Passbook & Title Deed issued by Revenue Department: రెవెన్యూ శాఖ జారీ చేసిన పట్టాదారు పాస్‌బుక్ మరియు టైటిల్ డీడ్
  • Nil Encumbrance Certificate (EC) for a minimum 15 years: సబ్ రిజిస్ట్రార్ కార్యాలయం జారీ చేసిన కనీసం 15 సంవత్సరాల ఈసీ (EC)
  • Identity Proof: Aadhaar Card / Ration Card / Voter ID / PAN Card: గుర్తింపు పత్రాలు: ఆధార్ కార్డు, రేషన్ కార్డు, ఓటర్ ఐడీ, పాన్ కార్డు
  • Nationalised Bank Passbook with IFSC for Annuity Electronic Transfer: వార్షిక కౌలు చెల్లింపుల కోసం బ్యాంకు పాస్‌బుక్ మరియు IFSC కోడ్ వివరాలు
  • Any other statutory documents necessary to prove undisputed ownership (death certificate, legal heirship certificate, partition deed): నిర్వివాద యాజమాన్యాన్ని నిరూపించే ఇతర పత్రాలు (మరణ ధ్రువీకరణ, వారసత్వ పత్రాలు, భాగ పరిష్కార ఒప్పందాలు)

Rule 16: Statutory Dual-Tier Appeals Hierarchy

To prevent administrative overreach, Rule 16 provides an expeditious two-stage appellate ladder with strict 30-day filing limits:

First Appellate Authority⏱️ Within 30 Days
Commissioner, APCRDA (APCRDA కమిషనర్)

Any person aggrieved by any decision or order of the Competent Authority for Land Pooling (Deputy Collector) may file a statutory appeal before the Commissioner.

Second Appellate Authority (State Government)⏱️ Within 30 Days
Government of Andhra Pradesh (MA&UD Department) (ఆంధ్రప్రదేశ్ ప్రభుత్వం (పురపాలక & పట్టణాభివృద్ధి శాఖ))

Any person aggrieved by an order passed by the Commissioner in appeal may prefer a second appeal before the State Government whose decision shall be final.

Rule 9(6): Reconstitution Architectural Standards

Reconstituted plots are generated strictly conforming to modern geometric urban planning parameters:

  • Plot Shape & Form: Regular and rectangular shape, avoiding odd polygons or unusable acute angles
  • Frontage-to-Depth Ratio: Normally maintained between 1:1.5 to 1:3 for optimal building orientation and street frontage
  • Public Street Access: Every single reconstituted plot must have direct, unobstructed frontage to a planned public street
  • Allocation Proximity Rule: Reconstituted plots returned as near as feasible to the original pooled land, or strictly within a 5 km radius
  • Multi-Parcel Consolidation: Multiple fragmented parcels of a single owner across different locations pooled together into unified plots (Schedule II(1)(h))
  • Joint Allotment Option (Form 9.18): Co-owners or family members may jointly apply under Form 9.18 to receive a larger combined commercial or residential plot

Rule 5(7): Automatic CLU & Conservation Exclusions

Land use automatically converts to urban zoning upon pooling without CLU conversion charges. However, automatic CLU strictly DOES NOT apply to:

  • 🚫 Bio-conservation and environmentally protected ecological corridors
  • 🚫 Water bodies, riverfront buffers, natural streams, tanks, and irrigation lakes (Cheruvulu)
  • 🚫 Reserved flood buffer zones along the Krishna River
  • 🚫 Reserved forest lands and notified eco-sensitive plantations
💡 Guarantees total statutory ecological protection for the Krishna River basin and natural drainage channels.

The 7 Villages Authorized Under LPS 2.0 (G.O.Ms.No. 252)

Total Regional Extent: 20,494.00 Acres
S.NoRevenue VillageDistrict & MandalPatta Land (Ac)Assigned (Ac)Govt Land (Ac)Total Area (Ac)
1Vykuntapuram (వైకుంఠపురం)Palnadu / Amaravathi1,965.000.001,395.483,361.00
2Pedamadduru (పెదమద్దూరు)Palnadu / Amaravathi1,018.000.00127.001,145.00
3Endroy / Endrayi (ఎండ్రాయి)Palnadu / Amaravathi1,879.0046.00241.002,166.00
4Karlapudi Lemalle (కర్లపూడి)Palnadu / Amaravathi2,603.0051.00290.752,944.00
5Vaddamanu (వడ్డమాను)Guntur / Thulluru1,763.294.72168.861,936.87
6Harichandrapuram (హరిశ్చంద్రాపురం)Guntur / Thulluru1,377.882.29977.871,380.17
7Pedaparimi (పెదపరిమి Units 1 & 2)Guntur / Thulluru5,886.180.00627.346,513.00
🏛️

Case Study: Early 2026 Village Gazette Publications (LPS 2.0 Operational Pipeline)

Between January and April 2026, the APCRDA executed the statutory LPS 2.0 mandate across peripheral villages via dedicated Extra-ordinary Gazette publications, each backed by a signed Publication Certificate physically posted at the RDO, Sub-Registrar, Tahsildar, and Gram Panchayat offices.

Vaddamanu Unit

1,936.87 Ac
📍 Thulluru Mandal, Guntur Dist • 06-01-2026
Notification Dt. 06.01.2026

Officially declared intention to pool 1,936.87 acres under 2025 Rules with signed Publication Certificate.

Endrayi Unit

2,166.00 Ac
📍 Amaravati Mandal, Palnadu Dist • 06-01-2026
Notification Dt. 06.01.2026

Declared intention to pool 2,166.00 acres across dry and jareebu holdings.

Pedamadduru Unit

1,145.00 Ac
📍 Amaravati Mandal, Palnadu Dist • 07-01-2026
Notification Dt. 07.01.2026

Formal Declaration of Intention posted physically across all mandal and village administrative centers.

Karlapudi Unit

2,944.00 Ac
📍 Amaravati Mandal, Palnadu Dist • 11-01-2026
Notification No. 1/2026-LPS

Initiated pooling across 2,944.00 acres of agrarian holdings under Deputy Collector certification.

Pedaparimi Unit-1

3,072.23 Ac
📍 Thulluru Mandal, Guntur Dist • 13-04-2026
Notification No. 7/2026-LPS

Subdivided into Unit-1 covering 3,072.23 acres for optimal infrastructural planning.

Pedaparimi Unit-2

3,440.77 Ac
📍 Thulluru Mandal, Guntur Dist • 13-04-2026
Notification No. 5/2026-LPS

Unit-2 complementary pooling completing the village master boundary.

Harischandrapuram Unit

1,380.17 Ac
📍 Thulluru Mandal, Guntur Dist • 20-04-2026
Notification No. 16/2026-LPS

Formally pooled 1,380.17 acres of private land holdings excluding Government lands.

Vykuntapuram Unit

3,361.00 Ac
📍 Amaravati Mandal, Palnadu Dist • 20-04-2026
Notification No. 04/2026-LPS

Mandatory physical posting certificates signed across RDO, Sub-Registrar, Tahsildar, and Gram Panchayat offices.

Full Entitlement Matrix by Land Category

Patta Land (Standard Private Title)
పట్టా భూమి

Standard privately registered freehold agricultural land held under individual title deed with full patta passbook.

Dry Land Return:
1000 Res + 250 Com
₹30,000/yr
Jareebu Return:
1000 Res + 450 Com
₹50,000/yr
🌿 Orchard Bonus: ₹100,000 one-time for commercial plantations
Ex-Servicemen / Political Sufferers
మాజీ సైనికులు / రాజకీయ బాధితులు

Lands assigned to ex-military personnel or recognized political sufferers. Entitled to full parity with patta lands.

Dry Land Return:
1000 Res + 250 Com
₹30,000/yr
Jareebu Return:
1000 Res + 450 Com
₹50,000/yr
🌿 Orchard Bonus: ₹100,000 one-time for commercial plantations
Assigned Lands (Before 18-06-1954)
18-06-1954 కంటే ముందు అసైన్ చేయబడిన భూమి

Ancestral assignments issued prior to the 1954 cutoff date, qualifying for full patta equivalent compensation.

Dry Land Return:
1000 Res + 250 Com
₹30,000/yr
Jareebu Return:
1000 Res + 450 Com
₹50,000/yr
🌿 Orchard Bonus: ₹100,000 one-time for commercial plantations
Assigned Lands (After 18-06-1954)
18-06-1954 తరువాత అసైన్ చేయబడిన భూమి

Assigned lands governed under AP Assigned Lands (Prohibition of Transfers) Act 1977. Reconstituted plot provides alienable rights.

Dry Land Return:
800 Res + 100 Com
₹30,000/yr
Jareebu Return:
800 Res + 200 Com
₹50,000/yr
🌿 Orchard Bonus: ₹100,000 one-time for commercial plantations
Sivaijamadar / Un-objectionable Govt Lands
శివాయిజమాదార్ / అభ్యంతరం లేని ప్రభుత్వ భూములు

Eligible Sivaijamadar cultivators occupying un-objectionable government lands verified under revenue records.

Dry Land Return:
500 Res + 50 Com
₹0/yr
Jareebu Return:
500 Res + 100 Com
₹0/yr
Objectionable Govt Lands (Poramboke)
అభ్యంతరకర ప్రభుత్వ భూములు

Cultivators in objectionable locations (water bodies, canal poramboke). Granted residential rehabilitation plot.

Dry Land Return:
250 Res + 0 Com
₹0/yr
Jareebu Return:
250 Res + 0 Com
₹0/yr

Statutory Safety Nets & Social Welfare Under 2025 Rules

🛡️ Rule 14: Unauthorized Layout Buyer Protection

65% Standard Plot Return (Max 500 Sq. Yds)

Buyers who purchased and registered residential plots in unapproved, unauthorized layouts prior to the official LPS notification are formally protected under Rule 14. They are entitled to surrender the unapproved land and receive a regularized, bankable standard residential plot equal to up to 65% of their registered plotted area (capped at 500 Sq. Yards), eliminating decades of court disputes.

🌾 Social Security: Farm Laborer Pension

₹2,500/Month + Mandatory CPI-AL Indexing

To shield landless agricultural laborers from livelihood disruption, the 2025 Rules provide a baseline pension of ₹2,500/month per family for 10 years, upgraded with annual inflation indexing linked to the Consumer Price Index for Agricultural Labourers (CPI-AL). Additionally, the one-time commercial orchard garden bonus is codified at ₹1,00,000 per acre (100% statutory hike).

Explore Other Topics in APCRDA Knowledge Hub

Complete topic cluster covering Amaravati Land Pooling, zoning laws, plot lotteries, and legal opinions.

View All 9 Topics
Buyer's Guide

Before You Buy an APCRDA Plot or Habitation Site

Pooled-extent eligibility, single vs joint calculator, leftover-land checks, and R1 GIS vs 9.2 exemption proceedings.

Read Guide
Vision & Planning

Master Vision & 9 Theme Cities

Singapore master plan, 9 economic anchor cities, Vastu alignment & infrastructure grids.

Read Guide
696+ Plot Directory

APCRDA Standard Plot Codes & Sizes

Complete catalog of 991 standard plot codes (A1–E318, G1–M378) with unit converter.

Read Guide
Allotment Algorithm

Dynamic Lottery & STQC Certification

Government of India STQC security audit, SQL NEWID random selection & Nelapadu milestone.

Read Guide
Bylaws & FSI

Zoning Regulations & Building Norms

R1–R4 & C1–C6 zoning, enhanced FSI (up to 2.80), G+3 to G+11 floors, and relaxed setbacks.

Read Guide
Title & Bankability

Legal Opinion & Marketable Title

Standing Counsel Somu Krishna Murthy legal breakdown, freehold status & bank loan eligibility.

Read Guide
Owner Q&A

Bilingual FAQs (English & తెలుగు)

APCRDA source answers on Gramakantam, LPOC registration, sales, disputes & annuities.

Read Guide
Primary Sources

Official Gazette & Documents Archive

Catalog of 10 official APCRDA Government Orders, notifications, and master publications.

Read Guide
APCRDA Land Calculator & Capital Map